Current project
Bakhty–Ayagoz
Railway infrastructure
Almaty Region / East Kazakhstan Region
272
km · Line length
11
stations · Stations in the project
Schematic progress diagram — 11 stations over 272 km, not geographically plotted
About the project
Comprehensive design support
The new Bakhty–Ayagoz railway line. The confirmed contractual scope demonstrates Samruk Advisory’s ability to deliver a comprehensive railway project — from surveys and design through State Expert Review to design supervision during construction.
Contractual scope
Samruk Advisory’s role in the project
Contract CHEC/CKTRJ/ZX/2025/005
- Engineering surveys and geodetic works
- Feasibility study update, technical design and detailed design
- Cost estimate documentation and quantity schedules
- State Expert Review process
- Working drawings for track, bridges and station facilities
- Electrification, communications and signalling
- Design supervision and technical support
In progress
Status
Almaty Region / East Kazakhstan Region
Region
The key benefit is unified coordination of design solutions ahead of procurement and construction. Figures and scope of work are based on the project’s confirmed contractual materials.
A Category I design license (GSL No. 05884) is confirmed. A separate license for independently performing licensed construction and installation works is not confirmed — such works are carried out within applicable permits, using in-house or engaged specialized resources.